Site Selection & Infrastructure Gap Analysis

Identify underserved areas, assess facility accessibility and prioritize locations for further investigation.

Discuss your location study

We combine resource or demand estimates, facility inventories and transport analysis to help organizations decide where additional infrastructure may be needed. The study starts with the decision you need to make and the geographic area, time horizon and constraints that matter.

What we deliver

  • Resource and demand maps, with measured and modelled values distinguished
  • Cleaned facility inventories with capacity information where available
  • Road-distance and drive-time catchments, accessibility and logistics maps
  • Coverage and capacity-gap assessments
  • Suitability maps, ranked opportunities and documented scoring assumptions
  • GIS datasets, regional summary tables, sources and data dictionaries

How we work with you

  1. Define the study area, scenarios and practical travel thresholds.
  2. Prepare demand, facility and road data; document missing information.
  3. Assess accessibility and reachable capacity, then compare candidate locations using agreed criteria.
  4. Review assumptions and deliver maps and data in agreed formats.

Build on your existing ArcGIS data

We use ArcGIS Pro and the relevant analysis tools to work with your existing ArcGIS layers, facility inventories and agreed external datasets. We check coordinate systems, dates, geographic units and identifiers before combining them. Your operational records remain distinct from the analytical layers and modelled estimates produced for the study.

Results can be shared through agreed ArcGIS maps and services and delivered as GIS datasets and summary tables. We document source dates, assumptions, scoring weights and measured versus modelled values so your planning or economic team can interpret and reuse the output.

If you already use ArcGIS, we review the layers, maps and analytical outputs you rely on before defining the study workspace. Connections to planning, demand or economic models use agreed identifiers, geographic units, dates and exchange formats so estimates can be reconciled across systems.

How we apply this in your sector

Water and wastewater utilities

Plan service coverage using demand estimates, existing infrastructure and access constraints. For water and wastewater studies, distinguish gaps in geographic coverage from questions about hydraulic capacity: proximity to a pipe does not establish that a connection can be served. We define the GIS assessment boundary and the engineering inputs needed before ranking opportunities.

Electricity distribution

Compare growth areas, existing asset locations, access routes and land constraints to screen locations for further investigation. Electrical capacity and connection feasibility remain inputs from the utility’s engineering teams; a spatial suitability score does not replace load-flow or protection studies.

Streetlights and poles

Bring together the pole inventory, road network, reported faults and ownership boundaries to identify areas for survey or renewal review. Missing inventory records and missing lighting are different problems. We flag uncertainty and use engineering lighting assessments where illumination performance must be established.

Traffic signals and intersections

Map intersections, existing signal assets and available traffic or incident evidence to prioritize detailed assessment. The result is a transparent shortlist with criteria and data gaps, not an automatic recommendation to install signals or change timing.

Stormwater and drainage

Combine catchment boundaries, inlets, culverts, reported flooding and development plans to identify areas for investigation. Distinguish missing asset records from insufficient drainage provision. Hydraulic modelling and verified levels are separate inputs when assessing conveyance capacity; a concentration of flood reports alone does not establish the cause.

Campuses and shared facilities

Assess how buildings, entrances, walking routes and shared services serve a campus population. Compare expansion options against land constraints and access requirements. We agree whether the decision concerns pedestrian access, maintenance access or utility provision, because each requires a different measure of coverage.

Industrial facilities and sites

Screen industrial locations using material supply, nearby processing facilities, road access and agreed land-use constraints. Compare candidate aggregation or processing sites across present and future scenarios. Utility availability, environmental approvals and commercial feasibility require their own evidence before a shortlisted location becomes an investment decision.

Telecommunications infrastructure

Compare demand locations with documented network reach and access constraints to identify areas for survey or expansion planning. A nearby fiber route does not prove spare capacity or an available connection. Radio coverage assessments require appropriate propagation inputs and validation, rather than treating distance from a tower as coverage.

What this looks like in practice

For example, a recycling infrastructure study can compare estimated material volumes with processing capacity reachable by road. Areas with substantial unserved volumes become candidates for further assessment. This is an illustrative application, not a claim of completed project results.

Defining the project scope

Modelled distributions are estimates, not observed quantities. Suitability rankings support screening; they do not establish commercial feasibility, land availability or regulatory approval.

Start with your organization’s needs

Tell us about your scope, available data and the decision or process you want to improve. We will discuss an appropriate next step.

Discuss your location study